So most of the ceiling in the workshop is insulated. I ran out of insulation today before I finished. Talked to the property owners today and let them know the machine was coming soon and they said they would get the rest of the stuff out of the garage. Clearly there will be more left in there than I had expected but it shouldn’t affect the operation of the machine.
Been having trouble coming up with an adapter for the generator exhaust. I need to route the exhaust through a muffler and then outside so it’ll be quieter an I won’t die from CO poisoning. I should able to start building the enclosure soon. Just realithat I forgot to buy soundproofing compound at Menard’s during the 15% off sale. Why in the World didn’t I remember to put that on my list or buy it. Literally bought screws for the bag sale! Ugh, what’s 15% off of $75? Like 10 bucks? The whole time at the store I kept thinking there was something else. Would have been really nice if the 11% rebate from November had gotten here before now.
